India and Vietnam signed a Memorandum of Understanding (MoU) in order to promote exchange of knowledge, best practices, and information between the two countries and to explore new business opportunities in the field of solar energy. The MoU was signed between Pranav R. Mehta, Chairman of National Solar Energy Federation of India (NSEFI) and Dao Du Duong, President of Vietnam Clean Energy Association on the sidelines of India-Vietnam Virtual Summit.

Representing 90% of Indian Solar Market

500+ Representations

30+ Events

120+ Members

49.7% Curtailment recorded since lockdown

Solar Power Installed Capacity(MW) Till November 2020

Total RE Installed Capacity Till November 2020

This year NSEFI successfully organised 3 bilateral events with Israel, South Korea and Vietnam and signed two MoU’s with Korea Photovoltaic Industry Association and Vietnam Clean Energy Association with aim to promote exchange of knowledge, best practices, and information between the two countries and to explore new business

NSEFI sent more than 500 representations this year on different issues and concerns. NSEFI representations received good response from the government and other agencies on serious issues. All representations sent from NSEFI are available on NSEFI website. CLICK HERE

Reports

  • Operation & Maintenance - Best Practice Guidelines / India Edition Read Full Report
  • Agrovoltaics in India - Overview of Operational Projects and relevant Policies Read Full Report
  • Global Market Outlook 2020-2024 Read Full Report
  • National Solar Energy Federation of India (NSEFI) SolarPower Europe and Indo German Energy Forum Jointly Launch O&M Best Practices Guidelines for Solar in India supported Read Full Report

NSEFI is providing real time curtailment data of RE plants in India which is available online through the live portal developed by NSEFI. This portal is live from more than 7 months because of timely contributions from NSEFI Members and Solar Industry Partners. This data is also shared with state level Discoms, RLDCs, POSOCO, MNRE and CEA on a weekly - basis.

NSEFI Events

January 2020

NSEFI National Executive Committee Meeting - To review NSEFI 2019 activities and to discuss other issues.

January 09, 2020

NSEFI Chairman Pranav R Mehta attending IRENA Assembly representing Global Solar Council at WFES 2020

January 11, 2020

NSEFI Chairman Pranav R Mehta presenting at International Solar Alliance Pavilion WFES 2020

January 15, 2020

NSEFI CEO Subrahmanyam Pulipaka, at a panel discussion on KUSUM Scheme during 19th Renewable Energy Summit 2020

January 19, 2020

February 2020

NSEFI Dialogue with Project Finance Heads/CFOs of Member Companies

February 06, 2020

ICC 8th Green Energy Summit 2020 - Renewable Energy Should Lead Energy Transition

February 11, 2020

March 2020

NSEFI CEO Subrahmanyam Pulipaka along with Mr. Mate Heisz, Head of International Cooperation, SolarPower Europe along with MNRE PV rooftop cell meeting Shri Amitesh Kumar Sinha to present a pre-launch document of India Market Opportunities report

March 03, 2020

Stakeholder consultation workshop of SolarPower Europe, National Solar Energy Federation of India (NSEFI) and Indo German Energy Forum- SO best practices guidelines for O&M in solar plants in India

March 04, 2020

Launch of SolarPower Europe and NSEFI joint report on “India: Solar Investment Opportunities” by Upendra Tripathy, DG, International Solar Alliance

March 04, 2020

NSEFI CEO Subrahmanyam Pulipaka presenting - NSEFIand - SolarPower Europe - report on India Solar Investment Opportunities Report to Shri - Amitesh Kumar Sinha - in the presence of representatives from resident EU Embassies including France, Italy, Germany, Poland, Czech Republic

March 06, 2020

April 2020

NSEFI organized stakeholder consultation of Inverter Committee Meeting with Shri B S Negi, MNRE to discuss the impact of COVID -19 on the sector

April 03, 2020

NSEFI arranged a Solar Rooftop stakeholder interaction on COVID 19 & Impact on Solar Rooftop Sector with Shri Amitesh Kumar Sinha (JS, Solar), MNRE along with MNRE Rooftop team

April 17, 2020

NSEFI CEO addressed a panel discussion on Reviving the Solar Sector: Optimism in times of uncertainity organized by CEEW

April 24, 2020

NSEFI organized State levelSolar Industry Associations meeting to discuss status of sector in respective states and to work closely to achieve the goal

April 27, 2020

May 2020

NSEFI Chairman Pranav R Mehta addressed ET Energy World Virtual Roundtable discussion on COVID-19 Impact on Solar

May 07, 2020

NSEFI on its 9th foundation day organized a session on International Cooperation in Indian Solar Rooftop Sector

May 08, 2020

NSEFI and IGEF jointly organized a webinar on Business Opportunities for AgroPV in India – Learnings from Europe and India where MNRE Joint Secretary Shri Amitesh Kumar Sinha was the chief guest

May 22, 2020

June 2020

NSEFI and SolarPower Europe launched the working of the O&M Best practices document development group with a Kick-off call

June 04, 2020

NSEFI organized an interaction of rooftop committee with - Shri Yeptho, GM, IREDA on the status of financing in rooftop segment–NSEFI organized an interaction of rooftop committee with - Shri Yeptho, GM, IREDA on the status of financing in rooftop segment

June 13, 2020

NSEFI CEO Subrahmanyam Pulipaka presented Indian market outlook at Global Solar Market Outlook Launch Conference organized by Smarter E Europe

June 17, 2020

NSEFI in partnership with Ministry of economy and trade, Government of Israel and Israel Export Institute organized India Israel Solar Industry Dialogue. Chairman delivered the welcome remarks and NSEFI CEO presented an overview of Indian solar market

June 18, 2020

NSEFI Chairman Pranav R Mehta spoke at ET Energy World Solar Energy Storage Virtual Roundtable

June 19, 2020

July 2020

NSEFI in collaboration with EU Indian Technical Collaboration program, PV Cycle and SolarPower Europe organized a Stakeholder Consultation Meeting on PV Waste Management in India

July 08, 2020

NSEFI conducted a BOS Stakeholder Consultation with NSEFI BoS members

July 13, 2020

NSEFI Chairman Pranav R Mehta was the chief guest at the Solis 1500V Inverter launch

July 22, 2020

NSEFI organized a closed-door(virtual) session on Solar Cell technologies research landscape in India - Industry Academia Collaboration with officials from - Ministry of New and Renewable Energy, Government Of India - TERI - The Energy and Resources Institute - @DST, Ministry of Science and Technology and Researchers and Scientists from - Indian Institute of Technology, Kanpur - International Advanced Research Centre for Powder Metallurgy and New Materials - Sri Venkateswara University - and other leading Engineering and Science research institutions.

July 27, 2020

August 2020

NSEFI Chairman Addressed a panel at COvid-19 vs PV 20 Organized by APVIA and SEAS

August 26, 2020

September 2020

NSEFI CEO Subrahmanyam Pulipaka spoke at Renewable Energy India Expo - CBC Manufacturing event

September 03, 2020

NSEFI CEO Subrahmanyam Pulipaka spoke eSuryaCon Chandigarh, Punjab & Haryana

September 03, 2020

NSEFI Chairman Pranav R Mehta was interviewed byAnand Gupta, Managing Editor Eq

September 05, 2020

October 2020

NSEFI and - SolarPower Europe - organized a joint webinar on Green Hydrogen in India and EU with participation from leading industry and policy makers from both India and EU who deliberated on the way ahead for Green Hydrogen. Shri JyotiLal, IAS, Secretary, Government of Kerala was the chief guest.

October 13, 2020

In presence of Hon. Consulate General of Korea in Mumbai and NSEFI Chairman - Pranav Mehta , signed two MoUs on behalf of NSEFI with - KOTRA - and Korean Photovoltaic Industry Association (KOPIA)

October 13, 2020

NSEFI & NHPC organized a joint stakeholder consultation on Development of Ultra Mega Solar Park at Deoria, UP

October 22, 2020

December 2020

NSEFI CEO Subrahmanyam Pulipaka addressed a panel at CII Godrej Green Business Centre annual flagship event - Green Power 2020 on the Growth of Solar – Challenges & Opportunities

December 02, 2020

National Solar Energy Federation of India (NSEFI), SolarPower Europe and Indo German Energy Forum- SO launchede O&M Best practices guidelines for Solar in India

December 09, 2020

Indo German Energy Forum- SO and National Solar Energy Federation of India (NSEFI) jointly launched a report on Agrovoltaics in India - Overview of Operational Projects and relevant Policies.

December 10, 2020

India and Vietnam have signed a Memorandum of Understanding (MoU) in order to promote exchange of knowledge, best practices, and information between the two countries and to explore new business opportunities in the field of solar energy. The MoU was signed between Pranav R. Mehta, Chairman of National Solar Energy Federation of India (NSEFI) and Dao Du Duong, President of Vietnam Clean Energy Association on the sidelines of India-Vietnam Virtual Summit.

December 22, 2020

NSEFI Representations

Date Agency Addressed To Subject
7th January, 2020 Ministry of Micro, Small and Medium Enterprises Minister of State (independent Charge) Request your Intervention for exemption of Bid Security (EMD) for MSME companies in NTPC’s 923 MW Solar EPC tender - Reg
Prime Minister Office Honorable Prime Minister of India
NTPC Chairman & Managing Director
Executive Director (RE)
8th January, 2020 Government of India Honorable Minister of Finance Budget suggestions applicable to consultancy/management services provided by Senior Citizens
13th January, 2020 UPERC Secretary Request meeting to discuss Notification of Standard draft of Wheeling Banking Agreement (WBA)
Honorable Chairman
Govt. of UP Principal Secretary to Honorable Chief Minister
Infrastructure and Industrial Development Commissioner
Uttar Pradesh New & Renewable Energy Development Agency Director
13th January, 2020 NTPC AGM (RE-CS) / Manager (RE-CS) Additional Queries / clarifications for NTPC’s 923 MW Solar EPC tender– Reg.
14th January, 2020 NHPC Chairman & Managing Director Request for amendments and extension of bid date by 1 month for tender 2019_NHPC_499803_2
Ref:- NHPC Tender "Request for Selection Document for Grid connected Solar Photo Voltaic Projects of 2000MW to be set up anywhere in India"
General Manager
MNRE Secretary
3rd February, 2020 MNRE Secretary Request for clarification on affective Basic Custom Duty {BCD} on solar cells and modules import
4th February, 2020 SBI lnfra Management Solutions Private Limited Managing Director and CEO Non-compliance of modal SECI solar tender document & non-viability of small solar tender in RESCO rnode
7th February, 2020 MNRE Secretary Disbursal of Subsidy to Rooftop Developers under REIL Scheme of 50 MW Rooftop Solar (NIT No.: REIL/BID/RTS © - 2018-19/002 dated 25.06.2018)
Joint Secretary
REIL Managing Director
7th February, 2020 SECI Managing Director Request to incorporate in upcoming bidding documents of upcoming tenders regarding applicability of any Basic Custom Duty on modules as Change in Law event and others
7th February, 2020 CERC Secretary ISTS Transmission Charges and Losses waiver given to wind/ solar proiects till 33.st
December 2022: Request for similar dispensation to wind/solar hybrid proiect with qr without storage as well as to other mode of RE transaction and also extension of sante beyond 31st December 2022: Draft Sharing Regulation of CERC Reg
MNRE Secretary
8th February, 2020 APERC Secretary Request not to initiate any suo-moto proceedings on the basis of letter from CMD, APSPDCL seeking amendment to the regulation no. 2 of 2015 together with regulation 1 of 2016 to withdraw the exemptions given for transmission and wheeling charges in respect of all the solar power and wind power generators commissioned as per AP solar power policy, 2015 and AP wind power policy, 2015.
8th February, 2020 SECI Secretary SECI RfS regarding Selection of RE Power Developer for “Round-the-Clock” Supply of 400 MW RE Power to NDMC, New Delhi, and Dadra & Nagar Haveli under Tariff-based Competitive Bidding (RTC-I):- Regarding
MNRE Secretary
20th February, 2020 Ministry of Commerce and lndustry Economic Advisor National Solar Energy Federation of lndia's Suggestions for Solar lndustrial Policy
22nd February, 2020 Ministry of Power and New & Renewable Energy Honorable Minister of State (IC) Corona Virus; Development of Solar Manufacturing Ecosystem in India
MNRE Secretary
Joint Secretary
Scientist - D
24th February, 2020 APERC Secretary Public notice dated 13.02.2020 regarding public hearing to be held on 10.03.2020 in respect of proposed amendment of Regulation 4 of 2017 i.e., APERC (Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation) Regulations, 2017
8th March,2020 MNRE Secretary Release of Performance Bank Guarantee(PBG)s in lieu of alternative acceptable instrument.
Joint Secretary
NTPC CMD
SECI CMD
Director Solar
Director Finance
Director Power System
11th March,2020 TNERC Secretary NSEFI COMMENTS / SUGGESTIONS ON CONSULTATIVE PAPER FOR ISSUE OF TARIFF ORDER FOR SOLAR POWER AND RELATED ISSUES dated 12/02/2020
Ref: The text of the Consultative Paper webhosted in TNERC website.
14th March,2020 Government of Haryana Additional Chief Secretary - Power Request for intervention to relieve the regulatory stalemate derailing the Solar growth story of Haryana
Honorable Chief Minister
Depty Chief Minister
Minister Of Power
Chief Secretary
16th March, 2020 Ministry of Power Honorable Minister of State (IC) Request for reduction of performance bank guarantees for under construction solar projects from Rs. 20 Lacs/MW to Rs. 8.0 Lacs/MW in line with the revised standard bidding guidelines
16th March, 2020 APERC Secretary Request for extension of public hearing in OP.No. 4 of 2020, OP.No. 5 of 2020 and OP.No.16 of 2020, with regards to proposed amendment to APERC Regulation 2 of 2005 and Regulation 2 of 2006.
23rd March, 2020 MNRE Advisor (National Solar Mission) Development of Solar Parks and Ultra Mega Solar Power Projects – seeking clarification – reg.
Secretary
25th March, 2020 MNRE Secretary Permission for movement of manpower, equipment, spares, consumables, etc for Operation & Maintenance of Solar Power Projects
Secretary
25th March, 2020 Govt. of Telangana Honorable Chief Minister Outbreak of Novel Coronavirus across the globe and its huge adverse impact on Renewable Energy Industry - Seeking Relief under these extraordinary circumstances for Repayment of Loans
26th March, 2020 Govt. of Andhra Pradesh Principal Secretary -Energy and CMD AP Transco Relief to Renewable Energy Industry as a result of the Covid -19 outbreak
AP Transco JMD
APSPDCL CMD
NREDCAP CMD & VC
26th March, 2020 Govt. of Gujarat Additional Chief Secretary Relief to Renewable Energy Industry as a result of the Covid -19 outbreak
26th March, 2020 Govt. of Karnataka Additional Chief Secretary - Energy Relief to Renewable Energy Industry as a result of the Covid -19 outbreak
26th March, 2020 Ministry of Power and New & Renewable Energy Honorable Minister of State (IC) Representation on challenges faced by Solar Power Developers with Financial Institutions due to increase in base rate
26th March, 2020 Govt. of Madhya Pradesh Additional Chief Secretary Relief to Renewable Energy Industry as a result of the Covid -19 outbreak
26th March, 2020 Govt. of Rajasthan Principal Secretary Energy & Chairman RRECL Relief to Renewable Energy Industry as a result of the Covid -19 outbreak
26th March, 2020 Govt. of Telangana Special Chief Secretary & Principal Secretary - Energy Relief to Renewable Energy Industry as a result of the Covid -19 outbreak
TSTRANSCO CMD
JMD
TSSPDCL CMD
TSNPDCL CMD
28th March, 2020 MNRE Secretary Request for Extension of Atal Jyoti Yojana (AJAY) Phase II Scheme until 30th June, 2020
Joint Secretary(Solar)
28th March, 2020 MNRE Secretary Issue of guidelines to quality Renewable Power generation utilities as Essential service
Ministry of Power and New & Renewable Energy
Joint secretary (Solar) Honorable Minister of State (IC)
1st April, 2020 MNRE Secretary Release of payment to renewable Energy Project Developers and Curtailment of RE power by Distribution Licenses - Reg Ref:- (1) Reserve Bank of India (RBI) COVID -19 -Regulatory Package Ref. No. : RBI/2019-20/186 DOR.No.BP.BC.47/21.04.048/2019-20 Dated March 27, 2020 (2) MoP Notification Dated 28th March
Ministry Of Power Secretary
3rd April, 2020 Govt. of Odisha Principal Secretary Relief to Renewable Energy Industry as a result of the Covid -19 outbreak Ref: MNRE OM dated 01.04.2020 Re: Invoicing for RE power supplied
GRIDCO CMD
7th April, 2020 SECI Managing Director FM Notice issued by Uttar Pradesh Discoms to SECI
Ref: 1) SECI's letter to SPDs dated 28th March, 2020 ("SECI Letter") annexed with letter from Uttar Pradesh Power Corporation Ltd. ("UPPCL") (Ref. no. 485/UPPCL/PPA/PLNG) dated 27th March,2020 ("UPPCL Letter") and
2) SECI's reply to UPPCL (Ref. no. SECI/PT/UPPCL/2020) dated 28th March, 2020 ("SECI Letter")
3) SECI's reply to UPPCL (Ref. no. SECI/PT/UPPCL/2020/2) dated 30th March, 2020 ("SECI Letter2")
4) MNRE Office Memorandum vide F. No. 283/20/2020 - GRID Solar (ii) (" MNRE Payment OM")
5) MoP's letter No. 23/22/2019-R&R Part-4 dated 6th April, 2020 with the subject "Clarification to letters dated 27.03.2020 regarding Letter of Credit and 28.03.2020 regarding"("MOP Clarification")
MNRE Secretary
Joint Secretary (Solar)
12th April, 2020 Central Board of Indirect Taxes and Customs (CBIC)
MNRE
Chairman
Joint Secretary (Solar)
Request for waiver in interst on deferred duty payment for solar imports during lockdown
18th April, 2020 MNRE Secretary Request to issue advisory to all states reg: Rollover of banked electricity (from Solar PV Rooftop Projects and Open Access Renewable Energy Generating Stations under captive and Third - party Sale of FY 2019-20 and FY 2020-21 to FY 2021-22
Ref: MNRE Om No. 283/25/2020 - GRID SOLAR Dated 16.04.2020
Joint Secretary(Solar)
20th April, 2020 TANGEDCO Chairman and Managing Director Remedial Action Items addressing impact caused by COVID- 19 on Solar Power Sector in TN
20th April, 2020 TNERC Secretary Remedial Action Items addressing impact caused by COVID- 19 on Solar Power Sector in TN
TANGEDCO CMD
26th April,2020 CEA Chairman Important Power Evacuation/Transmission Corridor related Issues in Rajasthan being faced by Solar Developers Particularly with respect to Fatehgarh II GSS, Jaisalmer and Upcoming New Sub-stations in the area: Reg.
MNRE Secretary
Joint Secretary (Solar)
Central Transmission Utility COO - Planning
CERC Secretary
Power Grid Executive Director, NR -I
MNRE Advisor
28th April, 2020 CERC Chairperson NSEFI Inputs on REC Floor Price and Forbearance
Secretary
28th April, 2020 CERC Secretary NSEFI comments/suggestions/objections on Hon’ble Commission’s Order 5/SM/2020 dated 31st March, 2020 in the matter of determination of Forbearance and Floor Price for the REC framework
28th April, 2020 Ministry of Power & New Renewable Energy Principal Secretary Enforcement of Renewable Purchase Obligation (RPO) on the open access consumers – Reg.
CERC Chairman
4th May,2020 MNRE Joint Secretary Suggestions for creating a favorable economic framework for under-construction RE projects in India.
4th May,2020 SECI Chairman and Managing Director Suggestions for creating a favorable economic framework for under-construction RE projects in India.
7th May,2020 MNRE Advisor /Scientist- G Submission of comments on the proposed Draft Standard on “Technical requirements for Photovoltaic Grid Tie Inverters to be connected to the Utility Grid in India”.
Ref: F. No.223/35/2018-R&D Coord. Dated: 21.04.2020
11th May,2020 MNRE Secretary to the Government of India Request to introduce further bids like “Round the Clock” (RTC) supply of 400 MW RE Power and assured peak hour supply from RE Power (1200 MW).
15th May,2020 SECI General Manager (C&P) Request for amendment in definition of ‘’Net Worth’’
Ref No: 1. Tender No. SECI/C&P/NIT/2020/SCCL34 Dated: 17/03/2020
2. Tender No. SECI/C&P/NIT/2020/SCCL32 Dated: 23/03/2020
SCCL
Director Finance GM (E&M) Solar Energy
19th May,2020 Ministry of Power, New & Renewable Energy Honorable Minister of State (I/C) Blanket Extension of 6 months for Un-commissioned Renewable Energy Projects bid out before COVID Lockdown
20th May,2020 Govt. of Gujarat Chairman, Economic Revival Committee NSEFI suggestions on Solar Industry to Economic Revival Committee - Government of Gujarat
Principal Secretary (EPD)
GEDA
20th May,2020 PSPCL Managing Director Request for disbursement of payments for sale of renewable power from 01.04.2020 to 07.04.2020
Ref:
1. PSPCL Letter dated 30.03.2020 regarding Force Majeure notification
2. MNRE OM dated 01.04.2020
3. MNRE OM dated 06.04.2020
4. PSPCL Letter dated 07.04.2020
MNRE Secretary
Joint Secretary
25th May,2020 MNRE Scientist -D NSEFI Suggestions on “Draft Guidelines and model PPA for implementation of Off-Grid Solar Power Plants in RESCO model under MNRE Programme”
25th May,2020 Ministry of Power, New & Renewable Energy Honorable Minister of State (I/C) Extension on waiver of ISTS Transmission Charges and Losses beyond 31st December 2022
25th May,2020 Govt. of Karnataka Hon’ble Chief Minister Request for urgent intervention in disbursement of Safe Guard Duty (SGD) Claims under Change in Law (CIL) matter pending at Hon’ble KERC.
27th May,2020 Govt. of Rajasthan Principal Secretary (Energy) Request for removal of Rajasthan Renewable Energy Development Fund (RREDF) and interim clarification for projects commissioned under the Rajasthan Solar Energy Policy 2014 and Rajasthan Solar Energy Policy 2019
28th May,2020 CERC Secretary Submission of Comments/Suggestions on Draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020.
Ref: CERC advertisement No RA-14026(11)/4/2020-CERC, “Public notice: Inviting comments on Draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations 2020” dated 29th April 2020.
29th May, 2020 GPCL Chairman Request for extension of Bid Submission date to 30th June, 2020 for the “Solarisation of Modhera Sun Temple & Town” Project under GPCL due to COVID-19 lockdown related challenges
Ref: RFP No - GPCL/ Solar/EPC/2019-20/22
GM Projects
Govt. of Gujarat Secretary (EPD)
MNRE Secretary
1st June,2020 Ministry of Power Secretary Request to issue suitable direction, under Section 107 of the Act, to the CERC for amendment in the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 - to not levy ISTS Transmission Charges on the RE developer due to operationalization of its LTA if its project commissioning get delayed.
4th June,2020 Energy and Petrochemicals Department, Government of Gujarat Additional Chief Secretary Request for extension by 1 week for payment of deposit and FQ under Surya Gujarat Scheme due to Covid 19 epidemic crisis
PGVCL
DGVCL
UGVCL
MGVCL
Torrent Power
5th June,2020 Govt. of Gujarat Honorable Minister of Energy Request for extension by 1 week for payment of deposit and FQ under Surya Gujarat Scheme due to Covid 19 epidemic crisis
PGVCL
Principal Secretary, EPD
8th June,2020 Govt. of Karnataka Honorable Chief Minister Disposal of safeguard duty claims by KERC and exorbitant / arbitrary court fees (0.5% of Safeguard duty claim) being sought by KERC – Request your kind intervention – Reg.
Reference:
1. NSEFI letter to Hon’ble CM vide reference No. NSEFI/CMKRTA/2020-21 dated 25.05.2020
2. Email from the Hon’ble Chief Minister’s Office to the Additional Chief Secretary (Energy) Karnataka
8th June,2020 SECI GM (C & P)/ Manager (C & P) Comment / suggestion on SECI’s RFS for “SETTING UP OF 2000 MW ISTS-CONNECTED SOLAR POWER PROJECTS (TRANCHE-IX)”
Ref:
1. RfS No. SECI/C&P/SPD/ISTS-IX/RfS/2000MW/032020
2. Amendment No.1 to RfS dated 04.06.20202
10th June,2020 PSPCL Chairman & Managing Director Low Grid Availability at Jhunir & Sardulgarh region under Mansa district causing huge losses to Solar Power Developers.
Govt. of Punjab Energy Secretary
12th June, 2020 Govt. of Telangana Honorable Chief Minister Request for urgent intervention against arbitrary curtailment of Solar Power generation by SLDC / TRANSCO
MNRE Secretary
MNRE Joint Secretary
Energy Deparment, Govt. of Telangana Secretary
TSSPDCL CMD
TSNPDCL CMD
TS - TRANSCO CMD
15th June, 2020 MNRE Secretary Six Months blanket extension to the timelines for completion for solar power projects
15th June, 2020 SECI GM (C&P) / Manager (C&P) Request for Extension of tender date for RFS Setting UP of 2000MW ISTS - Connected Solar Power Projects (TRANCHE - IX) to 15th July, 2020
Ref: RfSNo. SECI/C&P/SPD?ISTS-IX/RfS/2000MW/032020 and subsequent amendments
19th June, 2020 Ministry of Power & New & Renewable Energy Minister of State (I/C) Request for 12 month extension of ISTS charges and losses waiver
24th June, 2020 MNRE Secretary Regarding implementation of Basic Custom Duty on imported Solar Cells, Modules and inverters used in Solar PV Power Projects being developed in India, under various central and state schemes, to achieve the ambitious 100 GW target of solar capacity by 2022
Ref:-
1. Letter to Minister of Finance with D.O. No. 283/14/2017 - GRID SOLAR dated 18th September, 2019
26th June, 2020 Ministry of Power, New & Renewable Energy Minister of State (I/C) Request for an urgent meeting w.r.t. solar power generation projects and upcoming bid
Ref:- Implementation of Approved List of Models and Manufacturers (ALMM) for Solar Photovoltaic Modules starting 1st October, 2020
MNRE Secretary
MNRE Joint Secretary
30th June, 2020 Ministry of Finance Secretary Renewable Energy Industry and Impact of Novel Coronavirus (Covid -19) --- Seeking Relief under these extraordinary circumstances
30th June, 2020 MNRE Secretary Regarding implementation of Basic Custom Duty on imported Solar Cells, Modules and inverters used in Solar PV Power Projects being developed in India, under various central and state schemes, to achieve the ambitious 100 GW target of solar capacity by 2022
Ref:- 1. Letter to Minister of Finance with D.O. No. 283/14/2017 - GRID SOLAR dated 18th September, 2019
30th June, 2020 APERC Secretary NSEFI Response to APSLDC’s reply regarding Amendments to Regulations 4 of 2017 of APERC
Ref:- Lr. No. CE/APSLDC/SE-EBC/DE-DSM/F.AMEND20-12/D.No.41/20,Dt.11.05.2020
2nd July, 2020 Govt. Of Karnataka Honorable Chief Minister & Minister of Energy Extension of SCOD and other Interim Timelines under PPAs for ongoing renewable energy projects in Karnataka
MNRE Project Development Cell
MNRE Secretary
Energy Department, Govt. of Karnataka Additional Chief Secretary to Govt.
2nd July, 2020 Govt. of Bihar Honorable Chief Minister Request for Interventionregarding reimbursement of incentives under Bihar Industrial Incentive Policy for Solar Power Plants developed in the state of Bihar
3rd July, 2020 Ministry of Power, New & Renewable Energy Honorable Minister of State(I/C) Request for intervention to align the policy on loan and interest charges of IREDA on loans to SPD's against Annuity Payments of GST/SGD from SECI
MNRE Secretary
IREDA CMD
3rd July, 2020 Ministry of Power, New & Renewable Energy Honorable Minister of State(I/C) Grandfathering (Exemption) due to BCD for third party open access, group captive and Private rooftop PPAs --- estimated at 1500 MW
MNRE Secretary
MNRE Joint Secretary(Solar)
7th July, 2020 Govt. of Gujarat Honorable Chief Minister Extension of SCOD and other interim timelines under PPAs for ongoing renewable energy projects in Gujarat
MNRE Project Development Cell (PDC)
Secretary
Energy & Petrochemicals Department, Govt. of Gujarat Additional Chief Secretary of Gujarat
8th July, 2020 MNRE Secretary Disbursal of Subsidy to Rooftop Developers under REIL Scheme of 50 MW Rooftop Solar (NIT No: REIL/BID/RTS C -2018-19/002 Dated 25.06.2018
Joint Secretary(Solar)
REIL CMD
8th July, 2020 State Bank of India World Bank Extension in lieu of COVID Situation from the Requirement of Disbursement only within One year of Rooftop Project Commissioning under World Bank Scheme
AGM - Credit, Rooftop Funding Senior Energy Specialist
9th July, 2020 Ministry of Power, New & Renewable Energy Honorable Minister of State (I/C) Request for extension in project milestone timelines on account of lockdown due to COVID-19 outbreak -- extension till 30th November, 2020
MNRE Secretary
SECI Managing Director
MNRE Joint Secretary
9th July, 2020 Govt. of Punjab Ministry of Power, New & Renewable Energy In matter of PSPCL letter to various Solar Power Developers (SPDs) regarding discount of Energy Tariff
Honorable Chief Minister Honorable Minister of State (I/C)
13th July, 2020 Ministry of Power, New & Renewable Energy Minister of State (I/C) "Including NHPC in the Dispute Resolution Committee (DRC) MNRE OM No. 283/124/2018 - GRID SOLAR"
13th July, 2020 Ministry of Power, New & Renewable Energy Minister of State (I/C) Request to have a crave out in the DISCOM liquidity package for Andhra Pradeshs Renewable energy contracts that await decision of the AP High Court
14th July, 2020 Ministry of Power, New & Renewable Energy Minister of State (I/C) Request for issuing clarification for renewable energy equipment w.r.t. MOPs order No. 25-11/6/2018 - PG issued on 2nd July, 2020
16th July, 2020 CERC Chairman Request for suitable amendments in the appropriate CERC Regulations and policies of MNRE to align the project activities with applicable rules and regulations
16th July, 2020 Power Grid Corporation of India Ltd. Chief Operating Officer (CTU Planning) Request for extension of LTA operationalisation timelines in line to the SCOD of the projects revised under Force Majeure events by SECI/NTPC and Utilities
16th July, 2020 Govt. of Rajasthan Principle Secretary Energy Outstanding payment of renewable generators and 90000 Cr. Discom relief package of the Central Government
20th July, 2020 Govt. of Gujarat Chief Minister Request to allow IC approval and land alloted in the name of parent company to be utilized by its subsidiary , sister or affliliate company (having common parents / control)
20th July, 2020 Govt. of Gujarat Chief Minister Request for updates on Gujarat Land Allocation Policy - procedure and status Ref: G. R. JMN -3915-924-A. 1 dated 25th Jan 19 for allotment of wastelands for different RE developers
20th July, 2020 Ministry of Power Secretary Request to issue an advisory to Renewable Energy (RE) rich states to sale their surplus RE in real Time Market (RTM) platform available at Power Exchanges
22th July, 2020 MNRE Joint Secretary Request for MNREs Extension intervention to seek the early decision of AP PPA dispute
22th July, 2020 MNRE Joint Secretary Commissioning related difficulties being faced by Renewable Power Developers (RPDs in implementation of the Projects - Reg
22th July, 2020 PEDA Development Commissioner, MSME Request for facilitating empanelment of MSME solar module manufacturers in Punjab Energy Development Agency Ref: PEDA Tender PEDA/2020-21/003
29th July, 2020 Govt. of Gujarat (EPD) Additional Chief Secretary Grandfathering w.r.t. proposed levy of Basic Customs Duty (BCD) on solar cells and modules for Power Purchase Agreement (PPA) executed by various IPPs with Gujarat Urja Vikas Nigam Limited (GUVNL)
29th July, 2020 BAP - Jodhpur Sub Registrar "Request for extension of time Reference :- Notice dated July 24, 2020 bearing Sr. No. 2020/ 79-121 for assessment and hearing under section 20 of the Rajasthan Finance Act, 2020 (""Notice"")"
29th July, 2020 Rajasthan Renewable Energy Corporation Ltd (RRECL) Managing Director Request for waiver of land tax under Rajsthan Finance Act, 2020 for the solar projects being setup in the state of Rajasthan
29th July, 2020 Govt. of Rajasthan Energy Secretary Request for waiver of land tax under Rajasthan Finance Act, 2020 for the solar projects being setup in the state of Rajasthan
31st July, 2020 Government of India Honorable Minister of State(I/C), Power, New and Renewable Energy Request for extension in project milestone timelines on account of lockdown due to COVID-19 outbreak – 6 months from the original SCOD date or 2 months from readiness of transmission infrastructure (whichever is later)
31st July, 2020 Ministry of Power , New & Renewable Energy Honorable Minister of State (I/C) Request for extension in project milestone timelines on account of lockdown due to COVID-19 outbreak – 6 months from the original SCOD date or 2 months from readiness of transmission infrastructure (whichever is later)
5th August, 2020 MNRE Joint Secretary (Solar) "5 months extension of Financial Closure along with SCOD for Solar Projects Ref:- 1. MoP OM dated 27.07.2020 No. 3/1/2020 - Trans 2. NSEFI Letter dated 31.07.2020 3. MNRE Review meeting on 03.08.2020"
6th August, 2020 Government of Karnataka Additional Chief Secretary Energy Safeguard Duty Claims of Solar Developers pending with KERC - Request for Kind Intervention Ref: Charing of exorbitant and arbitrary court fees (0.5% of Safeguard duty claim) and delay in resolution
6th August, 2020 Ministry of Environment, Forest & Climate Change Secretary Order of the Honorable National Green Tribunal in O.A. No. 385/2019 with reference to the Great Indian Bustard
6th August, 2020 Ministry of Power Secretary to Govt. Of India Waiver of inter-state transmission charges and losses on transmission of the electricity generated from Solar and wind sources of energy under Para 6.4 of the revised Tariff Policy 2016 - Reg.
7th August, 2020 NTPC Chairman and Managing Director Waiver of inter-state transmission charges and losses on transmission of the electricity generated from Solar and wind sources of energy under Para 6.4 of the revised Tariff Policy 2016 - Reg.
10th August, 2020 CERC Secretary Request for incorporating specific provisions related to non-requirement of N-1 criteria for wind solar projects in the Indian Electricity Grid Code
14th August, 2020 CERC Secretary Request for incorporating specific provisions related to non-requirement of N-1 criteria for wind solar projects in the Indian Electricity Grid Code
14th August, 2020 RERC Chairman, Rajasthan Electricity Regulatory Commission NSEFI Comments on Rajasthan Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
14th August, 2020 PSPCL CMD, Punjab State Power Corporation Ltd. Request for intervention in the release of balance monthly energy payments deducted by PSPCL for the month of April, May and June 20 to Solar Power Developers.
17th August, 2020 GOI Shri R K Singh, Honble Power Minister, GoI Request for the Central Government's intervention to seek early decision of the AP PPA dispute

NSEFI Calendar 2021

January 2021

  • Green Hydrogen Coalition Launch
  • Solar Manufacturing Facilitation Program

Weekly Discussion on - Solar & Health

February 2021

  • India - ASEAN RE-Summit
  • Project Finance & CFO Summit

Weekly Discussion on – Solar & Women

March 2021

  • RE – 100 (Solar Source)
  • Inverters Round Table
  • SMART City Event

Weekly Discussion on - Solar & Health

April 2021

  • RenewX (Agro-PV)
  • DSM & Solar

Weekly Discussion on – Solar & Agriculture

May 2021

  • Foundation Day
  • Israel Event
  • SMART City Event

Weekly Discussion on - Solar & Youth

June 2021

  • Storage Event
  • Discussion with State Nodal Agencies on PM-KUSUM

Weekly Discussion on – Solar & Storage

July 2021

  • Ghar ke upar Solar* (May change)
  • African Event

Weekly Discussion on - Solar & Rural Electrification

August 2021

  • Annual NSEFI Conference
  • Discussion with State Nodal Agencies on PM-KUSUM

Weekly Discussion on – Solar & Education

September 2021

  • DISCOMs Pe Charcha -I (Uttar Pradesh & Madhya Pradesh)

Weekly Discussion on - Solar & Transport

October 2021

  • DISCOMs Pe Charcha -II (West Bengal & Odisha)

Weekly Discussion on – One Sun One World One Grid

November 2021

  • BRICS RE Council

December 2021

  • Inter Solar